Current FIT Tariff Payments

Written By: nuvision Published In: FITS Information Created Date: 2015-04-02 Hits: 1127

The latest Feed in Tariff payment information for Photovoltaic Installation as of 1st April 2015.

Description

Lower Rate (p/kWh)

Medium Rate (p/kWh) Higher Rate (p/kWh)
Solar Photovoltaic with total Installed capacity of 4kW or less, where attached to or wired to provide electricity to a new building before first occupation 5.94 11.63 12.92
Solar Photovoltaic with total Installed capacity of 4kW or less, where attached to or wired to provide electricity to a building which is already occupied  5.94 11.63 12.92
Solar Photovoltaic (other than stand alone) with total installed capacity greater than 4kW but not exceeding 10kW 5.94 10.54 11.71
Solar Photovoltaic (other than stand alone) with total installed capacity greater than 10kW but not exceeding 50kW 6.16 10.54 11.71
Solar Photovoltaic (other than stand alone) with total installed capacity greater than 50kW but not exceeding 100kW 5.94 8.67 9.63
Solar Photovoltaic (other than stand alone) with total installed capacity greater than 100kW but not exceeding 150kW 5.94 8.67 9.63
Solar Photovoltaic (other than stand alone) with total installed capacity greater than 150kW but not exceeding 250kW 6.16 8.59 9.54
Solar Photovoltaic (other than stand-alone) with Total installed capacity greater than 250kW 5.94 5.94 5.94
Stand-alone (autonomous) solar photovoltaic (not wired to provide electricity to a building) 4.44 4.44 4.44
Export Tariff  4.85 4.85 4.85

 

Notes 

The higher rate prevails if the following conditions apply:

*You will receive the lower rate payment where the system provides power to a building but does not have an EPC certificate showing an energy efficiency between bands A to D.

**The medium rate will be paid on on systems where the owner has 25+ FIT registered PV installations (The medium rate is 90% of the higher rate)